13 Jun 2026
DCP-III: Construction of HRT from RD 13,898 m to 15,105 m including Construction Adit-6, Surge Shaft, Butterfly Valve Chamber, Pressure Shafts, Powerhouse Complex, Tail Race Tunnel and Hydro-Mechanical Works.
Publish Date
22 Aug 2026, 13:05 hrs
Opening Date
17 Sep 2026, 15:30 hrs
Closing Date
17 Sep 2026, 15:00 hrs
Description
DCP-III: Construction of HRT from RD 13,898 m to 15,105 m including Construction Adit-6, Surge Shaft, Butterfly Valve Chamber, Pressure Shafts, Powerhouse Complex, Tail Race Tunnel and Hydro-Mechanical Works.
Documents
- Bidding Document for DCP-III 2.3 MB
- DCP-III_Annexure 1_ESMP 1.6 MB
- DCP-III_Annexure 2_OHSMF 1.3 MB
- DCP-III_Annexure 3_LMP 1.2 MB
- DCP-III_Annexure 4_Bill of Quantities 612.0 KB
- DCP-III_Annexure 5.1-Works Requirement_General Layout Map 5.2 MB
- DCP-III_Annexure 5.2-Works Requirement_KMZ File 5.0 MB
- DCP-III_Annexure 6-Technical Specification 5.0 MB