22 Aug 2026
DCP-II: Construction of Head Race Tunnel from RD 2,485 m to 13,898 m, including Construction Adit-2, Adit-3, 559 m remaining length of Adit-4 & Adit-5 and Hydro-Mechanical Gates.
13 Jun 2026
Annexure 5.2 kmz file shall be shared upon request
Publish Date
13 Jun 2026, 12:03 hrs
Opening Date
17 Sep 2026, 15:30 hrs
Closing Date
17 Sep 2026, 15:00 hrs
Description
DCP-II: Construction of Head Race Tunnel from RD 2,485 m to 13,898 m, including Construction Adit-2, Adit-3, 559 m remaining length of Adit-4 & Adit-5 and Hydro-Mechanical Gates.
Documents
- Bidding Documents for DCP-II 2.3 MB
- DCP-II_Annexure 1_ESMP 1.6 MB
- DCP-II_Annexure 2_OHSMF 1.3 MB
- DCP-II_Annexure 3_LMP 1.2 MB
- DCP-II_Annexure 4_Bill of Quantities 492.2 KB
- DCP-II_Annexure 5.1-Works Requirement_General Layout Map 5.2 MB
- DCP-II_Annexure 6-Technical Specifications 4.1 MB
- DCP-II_Annexure 7-Drawings 5.9 MB